
Built for infrastructure contractors
Vantara IQ connects your projects, crews, dailies, redlines, locates, materials, billing, subcontractors and financial intelligence in one platform.
From underground and aerial fibre to power, gas, water and civil infrastructure — know exactly what is happening across your operation.
Overview
Operations Center
Active projects
12
3 markets
Installed this week
47,820
linear feet
Ready to bill
$184,250
approved production
Est. gross margin
31%
production spread
Needs attention
Project health
Ridgeline Utility Partners · week ending 12 June
Most infrastructure contractors run on paper dailies, PDFs, spreadsheets, text messages, an 811 portal, accounting software, a separate inventory list, rate sheets, engineering maps and subcontractor invoices. Every handoff between them is somewhere a number gets retyped, and every retyped number is somewhere the story stops matching.
Each step feeds the next. The footage a crew files becomes the invoice to your customer, the crew’s own pay statement and the project’s margin — off one filing, at each side’s own rate card, with a trail back from any figure to the daily it came from.
Your operational data should not just sit in a database. Ask it what happened today, which projects are behind, which crews have not filed, what is ready to bill — and get an answer built from your own records rather than a guess.
It answers from the records it is given and says when it has none. It will not call a street clear because the sentence would read better that way.
Four things, worst first.
18,400 of 31,000 ft in the ground, 59% complete. Two crews on it. The slip started three weeks ago when Hollis moved to SC-072 and has not been made up since.
Production today, this week and this month. What is approved and ready to bill. Which projects are behind, which locates are blocking crews, which dailies never arrived. Then drill from the company down to a market, a project, a crew, a day, a single line of production.
Level 1
Company
Every market, every project, one figure
Level 2
Market
How a region is performing against target
Level 3
Project
Rates, crews, margin, documents, locates
Level 4
Crew · Daily · Line
Down to the individual production item
A crew files production from the truck with the redlined map and the photos attached. A supervisor reviews it. From that one approval comes the customer invoice, the crew’s pay statement, the retainage held on both sides, and the project’s margin.
Keener Rd
Pace Boring
ApprovedBilled to customer
$7,105
Crew earns
$5,015
Production spread
$2,090
Retainage held
$355
5%
One approved daily, both sides of the book
10,000 LF × $8.50
10,000 LF × $6.00
What the job earns
Both numbers come off the same approved daily at each side’s own rate card, so the invoice and the crew’s statement cannot drift apart. Figures are an illustration.
Daily
Keener Rd
Pre-work required
Your own locate is not signed off on this street.
Big targets, little typing, photographs first. A foreman opens the job, enters what went in the ground, marks the map, attaches the photos and submits — in the time it takes to finish a coffee.
And if a locate the crew is responsible for has not been signed off, the sheet says so before they start, not after.
Daily
Keener Rd
Pre-work required
Your own locate is not signed off on this street.
A pedestal that never went in. A handhole left open. A redline nobody sent. Raise it against the job with a photograph of what you found, put one name on it, and the foreman gets a text where he is standing.
Every task stays on that project’s record, so the punch list at closeout is the list of what was actually raised and what was actually done about it.
Activity
Every 811 ticket with its clock, every utility’s response, and the one distinction that matters most: a ticket can be entirely clear with 811 and still not safe to open the ground, because the locate on your own plant has not been walked.
Who performs which locate is set per project, so a utility your own crews walk stops holding up the ticket and starts holding up the dig — which is the truthful way round.
Every public utility has cleared. The locate this contractor performs on its own plant has not been signed off, so the crew’s own sheet says so before they break ground.
On hand
184,200
feet, 3 yards
With crews
22,450
issued, not installed
Variance
1.4%
over tolerance
Reel R-88142 · 144ct single mode
Receiving, yard, checkout, crew, project, installed. Fibre reels by number, conduit, vaults, handholes, pedestals, hardware — held by yard, so a reel in one yard is never confused with one three counties away.
What was issued against what the dailies say went in the ground, with a tolerance. A variance outside it is raised with a reason attached rather than quietly written off.
W-9, insurance, signed agreements, ACH and yard badges, chased by the system until the file is complete — a crew cannot be assigned work until it is. The packet stays on your side of the fence: you hold the record, not a folder on somebody’s laptop.
Assign them a project and they work inside it — which is what stops your office re-typing what they have already written down.
What a subcontractor sees
What they never see
Enforced in the queries that fetch the data, not by hiding a button.
Winning the job and being able to staff it are two different problems, and most contractors track them in two different places — a bid list in a spreadsheet, and the crews in somebody’s head. Vantara IQ keeps both, because the second decides whether you should bid the first.
Primes and customers you are working on, each opportunity with its market, estimated value, probability, bid date and expected award — moving from identified through estimating and bid submitted to awarded or lost. An awarded one becomes a project rather than being typed in again.
Qualified
6
Estimating
4
Bid submitted
3
Awarded
2
Not a contact list. What machines they own or rent, which trades they run and at what production, how many crews are free and from when, the markets they will travel to, their rates, their references, and how much of the prequalification file is in.
Availability is kept as a history rather than overwritten, because “committed through the 20th”, said in August, is what tells you in September that they are free.
3 crews free · available now · works GA, SC
Why 78
Equipment
Directional drill2 owned
Plough1 owned
Vac trailerrented
What they run
Directional bore900 ft/day
Plough2,400 ft/day
Splicingoccasional
Every part of it comes back with the sentence that produced it — 16 of 20 on equipment because there is no vac trailer. Missing information costs points and is called unknown, never unsuitable.
Set one and it raises a task owned by somebody, not a note in a box nobody opens.
Convert a crew and their contacts, equipment and rates carry across. It refuses to create a duplicate of a company you already work with.
Production on your customer's own form, with redlines and photos attached.
Engineering prints, field markups and as-builts tied to the daily and the billing.
Count bores, handholes, pedestals and footages off an engineering print instead of by eye across twenty sheets.
Approved production to customer invoice, with the trail back to the daily it came from.
Onboarding, compliance, rate cards, statements, retainage and disputes.
Revenue, subcontractor cost and production spread by project and market.
Assignments, approvals and pay notices reaching a foreman by text, with consent handled to carrier rules.
Contracts, COIs, W-9s, permits and as-builts filed against the company or project they belong to.
Opportunities, estimates and bids before a project exists — awarded ones become projects.
Aerials, field photographs, the engineering map and every document filed against the project they belong to — not a shared drive.
A priced rate sheet for a project or a crew, generated as a PDF with your company's logo on it, from the rates already on file.
Whether you run two crews or two hundred, in one market or across several states.
FTTH, backbone, middle-mile and last-mile. Underground, aerial and splicing.
Underground and overhead electrical infrastructure.
Distribution and mainline construction.
Water, sewer and civil utility projects.
Contractors running multiple crews, subcontractors and markets.
Central operational control across every subcontractor and project.
Run on separate systems
Run on Vantara IQ
Management by exception instead of management by spreadsheet.
A dedicated database and deployment per company. Nothing you enter is visible to another contractor.
Owner, project manager, supervisor, foreman, inventory, office, subcontractor — each sees what their job needs.
What you bill and what you pay are separate figures with separate permissions.
Every approval, rate change and payment carries who did it and when.
We do not claim a security certification we have not been through. What is described here is how the software is built, and we will walk you through any of it.
Named here so nobody buys on a promise. If one of these decides it for you, say so in the demo and we will tell you honestly where it stands.
Your company runs on its own dedicated system — your database, your jobs, your rates. Nothing you put in is visible to any other contractor using Vantara IQ.
Implementation
$1,000once
Your own system, stood up and configured — rate cards loaded, crews and projects brought across, your people trained on it.
Enterprise package
$250per month
The whole platform. Every module, unlimited projects, unlimited subcontractor crews, and their logins are free.
Your staff
$35per user, per month
Each of your own people with a login — owners, project managers, supervisors, foremen. Your subcontractors' logins are not charged.
What that includes
Projects. Crews. Dailies. Redlines. Locates. Materials. Billing. Subcontractors. Financials. Vantara IQ connects the field to the office and turns operational data into decisions.
Half an hour, walked through with one of your live jobs in front of us — your customer, your crews, your rates. You will know inside ten minutes whether it fits how you work.